India’s largest Hydropower project in the private sector.
   
With a head of 915m, the Vishnuprayag power house has the highest operating head.
   
World’s best equipments like Pelton Impulse turbo-generators are installed to ensure on sustainable basis, highest rated output during the life of the project.
   
Clean power at Competitive rates.
   
The total project cost is Rs.16940 million. The project got commissioned six months ahead of schedule.
   
The world’s largest Hydro-power project to be accredited for 1.32 Mn. annual Verified Emission Reduction (VERs).
   
The project during the FY-07 generated 951 MU at 98.5% plant availability.
   
The project is designed to generate 1774.4 MU in a 90% dependable year and 1947 MU in a 50% dependable year.
   
Dividend Declared:
 
Maiden Dividend of 7.0% in its first year of operation.
12% of interim dividend declared for FY-08.
   


     