 |
India’s
largest Hydropower project
in the private sector. |
| |
|
 |
With a head of 915m,
the Vishnuprayag power
house has the highest
operating head. |
| |
|
 |
World’s best
equipments like Pelton
Impulse turbo-generators
are installed to ensure
on sustainable basis,
highest rated output
during the life of the
project. |
| |
|
 |
Clean power at Competitive
rates. |
| |
|
 |
The total project
cost is Rs.16940 million.
The project got commissioned
six months ahead of
schedule. |
| |
|
 |
The world’s
largest Hydro-power
project to be accredited
for 1.32 Mn. annual
Verified Emission Reduction
(VERs). |
| |
|
 |
The project during
the FY-07 generated
951 MU at 98.5% plant
availability. |
| |
|
 |
The project is designed
to generate 1774.4 MU
in a 90% dependable
year and 1947 MU in
a 50% dependable year. |
| |
|
 |
Dividend Declared: |
| |
 |
Maiden Dividend
of 7.0% in its
first year of
operation. |
 |
12% of interim
dividend declared
for FY-08. |
|
| |
|