Power Generation
The project is designed to generate 1774.4 MU in a 90% dependable year and 1947.7 MU in a 50% dependable year.
 
Design Energy

PERIOD
MU
June, 2006 to March, 2007(Based on availability of water & actual date of commercial operation of the respective unit)
945.0
April, 2007 to November, 2007
1554.5
 
Actual Generation
PERIOD
MU
June, 2006 to March, 2007
951.5
April, 2007 to November, 2007
1640.5

     